Northern House Raising showed up this morning to start the preperations for the house being lifted later in the week.
I’m going to be posting pictures of the raise and restump every day that they work on it. Below are the photos that I took tonight after I got home from work. It was dark already but the flash did a pretty good job.
Day one of the Raise and Restump – Front of the House
(I always wanted to be able to drive the car in there)
(I always wanted to be able to drive the car in there)
Day one of the Raise and Restump – Rear of the House
Day one of the Raise and Restump – Under the House
It looks like now we will only need to be out of the house for one night, either Friday or Saturday. That is a lot better then when we thought we had to be out for the full week.
Pingback: Renovate Australia » Blog Archive » Day 2 of the House Lift
Pingback: Renovate Australia » Blog Archive »
Pingback: Renovate Australia » Blog Archive » Day 5 of the House Lift - Installing the I-Beams
Pingback: Renovate Australia » Blog Archive » Day 4 of the House Lift - Woops, missed this one
Pingback: Renovate Australia » Day 8 of the House Lift - Massive Footings
Pingback: Renovate Australia » Day 6 of the House Lift - Ready to Lift
Pingback: Renovate Australia » House Lift is Complete